Simple Build Budget Planner
Twenty-four line items across five sections, including everything the contract leaves out. Totals, variance and a contingency line.
Everything here is for the stage you're at right now — choosing land, choosing a builder, and signing a contract you actually understand. Download what you need, when you need it. It's yours to keep.
Work through them in order. Most people start with a floorplan and work backwards to a budget, which is how builds go wrong. The right order is budget, then land, then builder, then price, then contract — and that's the order these are numbered in.
Bookmark this page. It is your permanent access link — come back any time. We have emailed it to you as well, so check your inbox if you lose it.
Before you fall in love with a floorplan, know what you can actually spend.
Twenty-four line items across five sections, including everything the contract leaves out. Totals, variance and a contingency line.
The two decisions that set the ceiling on everything else.
Compare blocks on the things that actually change your build cost — soil class, fall, site costs, covenants. Works out price per square metre and total land cost.
Every builder you are considering, and what you have actually checked. Derives price per square automatically.
Score three builders side by side against eleven weighted criteria. Print it and take it with you.
Twenty-three things to check on the day. A display home is built to the best standard a builder is capable of — here is how to read one properly.
This is where the money is won or lost.
Builders do not quote the same things. This works out the true comparable cost — headline price plus site costs plus what it takes to match your spec.
Nineteen checks to complete before the contract is even put in front of you.
Eighteen points, clause by clause. The contract is the only moment in your build where you hold all the leverage.
Thirty-two documents you should be holding, from first quote to the end of the defects period.
Once you have signed, these are what you measure them against.
What your contract actually promised, and where you are against it. Finish date, days remaining, and whether you are past your contract date.
One hundred and twenty-two terms your builder, surveyor and contract will use, in plain English. Keep it open on your phone.
Your toolkit covers everything up to the moment you sign. Your Build Mentor covers all eight stages after it — slab, frame, lock-up, fixing, handover and the defects period — with progress tracking, variation and defect registers, a build assistant that knows your contract, and calls with a mentor when you need one.
The $29 you paid comes straight off your first month, if you join within 30 days. Nothing to enter — we'll apply it.
See what's inside